Waterproofing of the underground structure of the Mimoza hotel has been completed

Investor: MIMOZA GROUP D.O.O.
Object: HOTEL MIMOZA 5*, Tivat
Location: Urban plots UP 117 and UP 118 within the scope of a detailed urban plan 'Tivat-center' in Tivat (cadastral parcels 3384 i 3385, cadastral municipality Tivat)
HOTEL MIMOZA 5 * - We have successfully completed the waterproofing of the underground structure of the future Hotel Mimoza 5 * in Tivat. This was one of our most challenging and complex underground ventures.
Expressing seawater pressure along the entire depth of the underground part of the building, both horizontally and vertically, all combined with the “Top down” method of construction (from top to bottom), justifies this project in the category of one of the most demanding and responsible in construction and waterproofing not only from the aspect of our company but and at the level of the construction sector of Montenegro.
We have selected the "contact" underground waterproofing for the waterproofing underground system, the SikaProof waterproofing system, which grows into fresh concrete, fuses with it and in this way prevents the migration and spread of any water between the waterproofing layer and the concrete underground structure.

Project in numbers:

- Depth of underground structure ...........................11.50 m
- Height of underground water column .................. 10.30 m
- Pressure on the structure .................................... 1.03 bar
- The surface of underground waterproofing .......... about 7000 m²
- Length meters of working breaks in concrete ...... 1500 m
- Duration of works .................................................. 1 year